Name or Company:  
Email:  
Project Name:  
Inputs    
Module Type
   
Module Quantity
   
Tilt Angle (°)
   
Maximum Wind Speed (mph)
   
Exposure
   
Ground Snowload (psf)
   
Front Edge Clearance (in.)
   
Foundation    
Foundation Type
   
Include mounting posts in the order?
   
Soil Type
   
Foundation Shape
   
Foundation Size (ft.)
   
Outputs (Use the attached diagram at the bottom of this webpage to understand outputs)
  Array Dimensions
Number of Posts   Maximum Array Height (ft.)
Post Size   Array Length (ft.)
Post Spacing (ft.)   Array Width (ft.)
Beam Post Length Above Grade (ft.)      
Beam Post Length Below Grade (ft.)      
Total Post Length Required (ft.)      
Total Post Length Provided (ft.)      
Total Post Length Provided (in.)      
Product SKU  
Click "Go To Product" Button Below  
Product Link:  
Forces  
Calculated Wind Load on Array:   lbs.  
Force at Ground Level: ft-lbs. (Wind Load x Post Length)  
Calculated Snow Load on Array: lbs.